Infrastructure works & installation of charging stations

FLUXA has its own highly-skilled INFRA department that conducts all ground and excavation works in-house. We also provide the conduits, run power cables and install ground anchors and pedestals.

The Electricity/Charging Station team subsequently installs and connects the ALSB, mounts, connects and configures the charging station and rigorously tests the entire installation. This is followed by an inspection from a certified inspection body, after which the installation is released to the customer and they can start using their new charging infrastructure. Choosing FLUXA means choosing a single trusted partner who carries out all preparatory works and the final installation with meticulous attention to detail.

Fluxa